
Concrete Floating & Trowel Finishing Phenomena-Based Lesson: CONSTRUCTION TRADES (GRADES 10-12, 3 CREDITS) Presentation
$3.50
Microsoft PowerPoint (editable) + PDF (ready to print) · Instant download
This is the student-facing slide presentation that introduces the phenomenon, walks the class through observations and driving questions, and frames the evidence students will use for the Phenomena-Based Lesson in the Construction Trades (grades 9–12) chapter Concrete Floating & Trowel Finishing, built around the phenomenon CONSTRUCTION TRADES (GRADES 10-12, 3 CREDITS). It is sold separately from the other two parts of the set.
Complete the set: Concrete Floating & Trowel Finishing Phenomena-Based Lesson: CONSTRUCTION TRADES (GRADES 10-12, 3 CREDITS) Teacher Discussion Guide; Concrete Floating & Trowel Finishing Phenomena-Based Lesson: CONSTRUCTION TRADES (GRADES 10-12, 3 CREDITS) Student Response Sheet.
Sections: Construction Trades (grades 10-12, 3 Credits); Construction Trades (grades 10-12, 3 Credits); Construction Trades (grades 10-12, 3 Credits); Student Slide Show. Sample item: “1. Five bays were finished one way and one bay another way, on the same slab, from the same trucks. What single difference in the record explains why only Bay 3 failed?”
What's inside: Student Slide Show (editable .pptx + PDF, 14 slides).
Aligned Standards: Aligned to Career & Technical Education (CTE) program-of-study competencies for Architecture & Construction — construction, with embedded academic literacy and career-readiness skills.
Format: Microsoft PowerPoint (editable) + PDF (ready to print)
Classroom use: Project this presentation to introduce the phenomenon and guide the investigation, then move into discussion with the teacher guide.
Format note: If you do not open files with Microsoft Office, use the included PDF.