{"product_id":"hs-carpentry-millwork-exterior-load-bearing-wall-framing-project-based-learning-activity","title":"Exterior Load-Bearing Wall Framing Project-Based Learning Activity | Carpentry (Millwork) | Grades 9–12","description":"\u003cp\u003e\u003cstrong\u003eExterior Load-Bearing Wall Framing Project-Based Learning Activity\u003c\/strong\u003e is a project-based learning activity for \u003cstrong\u003eCarpentry (Millwork)\u003c\/strong\u003e (grades 9–12) on \u003cstrong\u003eExterior Load-Bearing Wall Framing\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003ePairs with:\u003c\/strong\u003e \u003ca href=\"\/products\/hs-carpentry-millwork-exterior-load-bearing-wall-framing-slide-show-presentation\"\u003eExterior Load-Bearing Wall Framing Slide Show Presentation\u003c\/a\u003e; \u003ca href=\"\/products\/hs-carpentry-millwork-exterior-load-bearing-wall-framing-guided-notes\"\u003eExterior Load-Bearing Wall Framing Guided Notes\u003c\/a\u003e; \u003ca href=\"\/products\/hs-carpentry-millwork-exterior-load-bearing-wall-framing-lesson-quiz\"\u003eExterior Load-Bearing Wall Framing Lesson Quiz\u003c\/a\u003e; \u003ca href=\"\/products\/hs-carpentry-millwork-exterior-load-bearing-wall-framing-unit-test\"\u003eExterior Load-Bearing Wall Framing Unit Test\u003c\/a\u003e.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSections:\u003c\/strong\u003e Carpentry (millwork) (grades 10-12, 3 Credits); Project Based Learning | Chapter 11. \u003cstrong\u003eSample item:\u003c\/strong\u003e “Driving question: Can your crew frame all four exterior walls of the 24-by-16-foot course build - on layout, on tolerance, and tied together - so the ceiling crew that follows you never has to fix you”\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eWhat's inside:\u003c\/strong\u003e Project Based Learning Activity (editable .pptx + PDF, 13 slides).\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eStandards:\u003c\/strong\u003e Aligned to Career \u0026amp; Technical Education (CTE) program-of-study competencies for Architecture \u0026amp; Construction — construction (carpentry and millwork), with embedded academic literacy and career-readiness skills.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eResource type:\u003c\/strong\u003e Project-Based Learning Activity. \u003cstrong\u003eFormat:\u003c\/strong\u003e editable Microsoft PowerPoint file plus a ready-to-print PDF.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eClassroom use:\u003c\/strong\u003e Students work through the project stations over several class periods, ending with a product they present. Built for Carpentry (Millwork), grades 9–12.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eFormat note:\u003c\/strong\u003e These files are delivered in Microsoft Office formats (Word and\/or PowerPoint). If you open a worksheet that includes tables in Apple Pages or another non-Microsoft app, table formatting may not display correctly. For best results, use Microsoft Word or PowerPoint (or upload the file to Google Docs). If you run into any formatting issues, contact us and we can send a PDF version.\u003c\/p\u003e","brand":"ConnectEd Market","offers":[{"title":"Default Title","offer_id":67956291404075,"sku":null,"price":5.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1020\/4836\/6891\/files\/hs-carpentry-millwork-exterior-load-bearing-wall-framing-project-based-learning-activity-cover-v2.jpg?v=1793396946","url":"https:\/\/connectedmarket.net\/products\/hs-carpentry-millwork-exterior-load-bearing-wall-framing-project-based-learning-activity","provider":"ConnectEd Market","version":"1.0","type":"link"}